General Facilities Overview

The field is being development using the Janice A Floating Production Vessel (FPV), a converted accommodation vessel (formerly the West Royal). The production and water injection wells are drilled from a single subsea cluster some 450 m away from the Janice A. The Janice A FPV is equipped with a single separation train, a test separator, water injection and gas lift facilities. Crude oil is exported via a 14" pipeline to the Teeside via the Phillips operated Norpipe line. Gas is exported via a 12" pipeline to the Phillips operated Judy platform.