Mixed AS

The mixed adaptation strategy is designed in order to provide a compromise between the interests of three main water users in the basin. Therefore, it includes all the measures favourable for the environment, since those are not in conflict with interests of food production and industry, and a majority of the measures to enhance food production and industrial development, with exception of measure F6 (salinity control and desalinization) and measure I2 (generate more hydropower in winter), which would be in conflict with water demands for agriculture. Measure I1 for this strategy is the construction of two new hydropower plants (A2) or three plants (B2) more than under business as usual.

0 0

Post a comment