Industrial measures

1. Build new The most costly measure. 4xno. reservoirs and dams hydropower plants

2. Generate This measure is the main reason for the conflict of 0-1 hydropower in interests between industry and agriculture on the one winter hand, and upstream and downstream countries on the other. Without a balanced transboundary water allocation policy, may lead to political instability in the region.

* Cost estimates are divided into five categories: 0, virtually no costs; 1, very low; 2, medium; 3, very costly; 4, extremely costly. For more details, see the relevant text.

Table 5.8. Adaptation measures and strategies proposed for the Syr Darya Basin.