Waste Receiving Handling and Temporary Storage

The process involved in the handling and storage of regulated waste can be summarized as follows.

I. Trucks enter the facility through the regulated waste entrance and remain in the regulated waste truck holding area until an unloading bay in the appropriate storage building becomes available.

2. As space becomes available, the trucks are directed to the appropriate building for unloading and testing.

3. Waste is unloaded and tested according to the waste acceptance procedure established at the facility and in the permit.

4. Waste accepted for disposal is allocated space in the chemically compatible storage area within the storage building. Waste not accepted will be managed appropriately.

5. Unloaded trucks are taken to the truck wash station and washed before being permitted to leave the facility.

6. Oversized debris and drums are collected for shredding and separate disposal at the facility. Separate disposal is required for all solid waste that is not suitable for feed to the solidification process. Oversized material and shredded drums is sized as necessary for disposal into the salt caverns.

7. The waste solids are sized and dewatered as necessary before conveyance to the waste solids hoppers for temporary storage and subsequent processing.

Figure 8 Waste processing facility.

NO.

IDENTIFICATION

200

GATE AND GUARD HOUSE

507

TRUCK HOLDING AREA No. 2

201

(REGULATED ENTRANCE)

(NONREGULATED)

TRUCK SCALES

508

DRIVER WAITING AREAS

(REGULATED ENTRANCE)

509

FIRE PROTECTION AND

202

REGULATED WASTE TRUCK HOLDING

RAW WATER STORAGE

AND SAMPLING AREA (COVERED)

510

WATER TREATMENT PLANT

203

SPILL RESPONSE/

AND FIRE PUMP HOUSE

OPERATIONS BUILDING

5) 1

ELECTRICAL SUBSTATION

204

SOLIDS BUILDING

512

BACKUP POWER

205

NONFLAMMABLE DRUM BUILDING

AND COMPRESSOR BUILDING

206

BULK UOUIDS AREA (COVERED)

513

SEWAGE TREATMENT

207

PROCESSING BUILDING

514

FUEL STORAGE TANKS

208

SOLIDIFIED MATERIAL BUILDING

515

THERMAL OXIOIZER AND

209

TRUCK WASH

WATER HEATER/BOILER

210

FLAMMABLE DRUM BUILDING

600

GATE AND GUARO HOUSE

300

PLANT OPERATIONS.

(NONREGULATED ENTRANCE)

PROCESS MATERIALS SUPPLY

601

VISITOR PARKING

301-310

DISPOSAL CAVERNS

602

ADMINISTRATION BUILDING

603

EMPLOYEE CLOCK ROOM

400

STORMWATER TANKS

LOUNGE. AND CAFETERIA

401

STORMWATER PONDS

604

EMPLOYEE SHOWER AND

EQUIPMENT ROOM

500

TRUCK SCALES

605

LABORATORY

(NONREGULATED ENTRANCE)

606

EMERGENCY RESPONSE AND

501

OIL STORAGE TANK

FIRST—AJO STATION

503

MAINTENANCE BUILDING

608

EMPLOYEE PARKING

504

WAREHOUSE BUILDING

506

TRUCK HOLDING AREA No. 1

701

RAW WATER AND BRINE

(NONREGULATED)

DISPOSAL PUMP HOUSE

702

DESANDER ANO LINED

BRINE POND

7QJ

LEACHING OPERATIONS BUILDING

Figure 9 Functional areas.

Figure 9 Functional areas.