Sedimentation separates solids from water using gravity settling of the heavier solid particles [9]. In the simplest form of sedimentation, particles that are heavier than water settle to the bottom of a tank or basin. Sedimentation basins are used extensively in the wastewater treatment industry and are commonly found in many flow-through aquatic animal production facilities. This operation is conducted not only as part of the primary treatment, but also in the secondary treatment for separation of solids generated in biological treatments such as activated sludge or trickling filters. Depending on the properties of solids present in the wastewater, sedimentation can proceed as discrete settling, flocculent settling, or zone settling. Each case has different characteristics, which will be outlined.

Discrete settling occurs when the wastewater is relatively dilute and the particles do not interact. A schematic diagram of discrete settling is shown in Fig. 2.

Calculations can be made on the settling velocity of individual particles. In a sedimentation tank, settling occurs when the horizontal velocity of a particle entering the basin is less than the vertical velocity in the tank. The length of the sedimentation basin and the detention time can be calculated so that particles with a particular settling velocity (Vc) will settle to the bottom of the basin [9]. The relationship of the settling velocity to the detention time and basin depth is:

For flocculent suspension, the formation of larger particles due to coalescence depends on several factors, such as the nature of the particles and the rate of coalescence. A theoretical analysis is not feasible due to the interaction of particles, which depends, among other factors, on the overflow rate, the concentration of particles, and the depth of the tank.

Zone settling occurs when the particles do not settle independently. In this case, an effluent is initially uniform in solids concentration and settles in zones. The clarified effluent and compaction zones will increase in size while the other intermediate zones will eventually disappear.

The primary advantages of using sedimentation basins to remove suspended solids from effluents from seafood-processing plants are: the relative low cost of designing, constructing, and operating sedimentation basins; the low technology requirements for the operators; and the demonstrated effectiveness of their use in treating similar effluents. Therefore proper design, lilEct ZCKW Oulldl zjonc lilEct ZCKW Oulldl zjonc

Figure 2 Schematics of discrete settling.

construction, and operation of the sedimentation basin are essential for the efficient removal of solids. Solids must be removed at proper intervals to ensure the designed removal efficiencies of the sedimentation basin.

Rectangular settling tanks (Fig. 3) are generally used when several tanks are required and there is space constraint, because they occupy less space than several circular tanks. Usually there is a series of chain-driven scrapers used for removal of solids. The sludge is collected in a hopper at the end of the tank, where it may be removed by screw conveyors or pumped out.

Circular tanks are reported to be more effective than rectangular ones. The effluent in a circular tank circulates radially, with the water introduced at the periphery or from the center. The configuration is shown in Fig. 4. Solids are generally removed from near the center, and the sludge is forced to the outlet by two or four arms provided with scrapers, which span the radius of the tank. For both types of flows, a means of distributing the flow in all directions is provided. An even distribution of inlet and outlet flows is important to avoid short-circuiting in the tank, which would reduce the separation efficiency.

Generally, selection of a circular tank size is based on the surface-loading rate of the tank. It is defined as the average daily overflow divided by the surface area of the tank and is expressed as volume of wastewater per unit time and unit area of settler (m3/m2 day), as shown in Eq. (2). This loading rate depends on the characteristics of the effluent and the solids content. The retention time in the settlers is generally one to two hours, but the capacity of the tanks must be determined by taking into account the peak flow rates so that acceptable separation is obtained in these cases. Formation of scum is almost unavoidable in seafood-processing wastes, so some settling tanks are provided with a mechanism for scum removal.

Selection of the surface loading rate depends on the type of suspensions to be removed. The design overflow rates must be low enough to ensure satisfactory performance at peak rates of flow, which may vary from two to three times the average flow.

where Vo=overflow rate (surface-loading rate) (m3/m2 day), Q=average daily flow (m3/day), and A=total surface area of basin (m2).

The area A is calculated by using inside tank dimensions, disregarding the central stilling well or inboard well troughs. The quantity of overflow from a primary clarifier Q is equal to the wastewater influent, and since the volume of the tank is established, the detention period in the tank is governed by water depth. The side water depth of the tank is

Efflutni

Efflutni

Figure 3 Diagram of a rectangular clarifier.
Figure 4 Diagram of radial flow sedimentation tank.

generally between 2.5 and 5 m. Detention time is computed by dividing the tank volume by influent flow uniform rate equivalent to the design average daily flow. A detention time of between 1.5 and 2.5 hours is normally provided based on the average rate of wastewater flow. Effluent weir loading is equal to the average daily quantity of overflow divided by the total weir length expressed in m3/m day.

where 7=detention time (hour), £=average daily flow (m3/day), and F=basin volume (m3).

Temperature effects are normally not an important consideration in the design. However, in cold climates, the increase in water viscosity at lower temperatures retards particles settling and reduces clarifier performance.

In cases of small or elementary settling basins, the sludge can be removed using an arrangement of perforated piping placed at the bottom of the settling tank [10]. The pipes must be regularly spaced, as shown in Figure 5, to be of a diameter wide enough to be cleaned easily in case of clogging. The flow velocities should also be high enough to prevent sedimentation. Flow in individual pipes may be regulated by valves. This configuration is best used after screening and is also found in biological treatment tanks for sludge removal.

Inclined tube separators are an alternative to the above configurations for settling [11]. These separators consist of tilted tubes, which are usually inclined at 45-60°. When a settling particle reaches the wall of the tube or the lower plate, it coalesces with another particle and forms a larger mass, which causes a higher settling rate. A typical configuration for inclined media separators is shown in Figure 6.

Was this article helpful?

0 0
Waste Management And Control

Waste Management And Control

Get All The Support And Guidance You Need To Be A Success At Understanding Waste Management. This Book Is One Of The Most Valuable Resources In The World When It Comes To The Truth about Environment, Waste and Landfills.

Get My Free Ebook


Post a comment