MPE at a Service Station MDA Maryland

At a service station in Maryland, MPE was conducted using a VE/GE system that consisted of 10 VE wells and 6 GE wells. The sites were located on a coastal plain, and the soil consisted of sandy silts and clays. The average flow rates were standard 16.7 m3/h (9.8 scfm) in the VE wells and 0.82L/min (0.24 gpm) for the GE wells. The concentration of MTBE in groundwater was reduced from 27,027 to 32^g/L over 3.5 years of system operation. The cleanup was reported as completed; however, a cleanup goal was not provided.50

Was this article helpful?

0 0
Waste Management And Control

Waste Management And Control

Get All The Support And Guidance You Need To Be A Success At Understanding Waste Management. This Book Is One Of The Most Valuable Resources In The World When It Comes To The Truth about Environment, Waste and Landfills.

Get My Free Ebook


Post a comment